Derek,

"You seem to be willfully refusing to deal with a reality that does
not conform to your ideal view of how the world should be."

This is the crux of where we differ, I guess. Yes, you are entirely
concerned with how software *is* practiced today. And I respect that.
Where I'm coming from is real, on-project experience involving at least 19
projects where the results are what I stated:

Development cost and schedule cut in half from typical
Delivered defects < 0.1 of typical
Long term maintenance < 0.25 normal

I'm not dreaming of some pie-in-the-sky, never-been-done-before ideal. We
*have* done it. More than once. And yet the people who weren't on those
projects refuse to acknowledge those successes.



"Quality as seen by the paying customer, which can be very different
from code quality."

The key word here is "can". As I said before, software could have perfect
internal structure and completely meet the stated requirements, but the
stated requirements could be totally wrong. So yes, high quality code
internally, panned by customers externally. It happens. But I'm talking
about how crappy internal code quality affects the paying customer's
perception of quality. A word processor that goes into an infinite loop on
a paste is crap quality regardless of how well the software might claim to
meet the "functional" requirements. I can give you a laundry list of other
defects that are clearly caused by crap code quality, not by incorrect
requirements. A small sampling:

*) Re-opening a document after an infinite loop crash has about a 10%
chance of "There is insufficient memory". I have to quit and restart a
second time before it will read the exact same document it just complained
about being too big

*) I try to save a document and it will complain "Not enough space on
disk" despite having gigabytes of free space on the disk. Only one file is
7 meg, the rest are well under 1 meg, most are about 400k

*) Lines of text in the document disappear at page boundaries. The lines
are really there, page rendering defects make them disappear. Adding a
blank line makes them come back. That's offset by opposite cases where the
same line appears both before and after the page boundary

*) Columns in tables can't be resized if that table crosses a page boundary

*) Even when a table is contained in the same page, column margins can't
be moved by more than 1/8 inch at a time. It requires many click-drag,
click-drag, click-drag events to move column margins any appreciable amount

*) If a word in a section of text was hyphenated by line-wrapping, when
that text is copied and pasted the hyphen is still in the pasted text even
though line-wrapping isn't happening at that word anymore

*) If a table is pasted into a document and the right edge of the table is
outside the right hand page margin, that edge of the table can't be
selected (for resize) until page layout is set to landscape so the table
margin is back inside the right side page margin

*) Switching page orientation to landscape to re-size a table has a 50%
chance of resulting in "Document is to big for <schlock product> to
handle" error

*) "Paste and match style" frequently doesn't match the style of what that
text was pasted into

*) Sometimes changing type size in a footnote causes the display content
to move by as much as 7 pages

*) Editing text within a footnote sometimes ends up as a footnote to the
footnote

I could go on. These are not mis-matched requirements issues, they are
simply amateur programmers at work. The same holds for other products from
this same company, I can give you a laundry list of crap-code induced
problems in them as well. If I wanted to, I could start lists for products
from other companies (next on my list would be Adobe) but seriously, I
don't have the time.



"Ok.  Can I have a copy of your data please.  I would be happy to
analyze and write about your success."


Unfortunately I don't have detailed to-the-person-hour data for these
projects. Besides, that data would almost certainly be considered
proprietary by the organization in question. That said, however, here's
data that I can give you:

*) A discrete event simulation system was built to allow traffic
throughput calculations for commercial airports. The legacy code was 44K
SLOC of Fortran and only handled a single runway. The company needed to
support parallel runway simulations. The two full-time maintainers said
the code could not handle parallel runways. The system was rebuilt from
the ground up. One developer was coached on doing model-based requirements
and design and replaced the legacy code in about 9 months with 8K SLOC of
Ada that also handled parallel runways and needed less than 1/4 FTE to
maintain from then on.

*) 767 Engine Simulator ATE: the most credible estimate for the project
was 18 months with 4 developers. The business need was 9 months. The 4
developers delivered in 7 months. Industry data for delivered defects in
real-time systems (Boehm) were 15-17 per K SLOC. We delivered 13K SLOC. We
claimed we would be no worse than the data for IT systems, 5-7 defects per
K SLOC. Commercial products were supposed to deliver 1-3 defects per K
SLOC. We based our estimate on 6 per K SLOC, this would estimate 78
defects delivered. Only 4 defects were reported by users in the entire
first year. That's a delivered defect rate of 0.3 defects per K SLOC and
that's for a real-time system. When we wlooked at defects found in model
reviews (for both requirements and design), we counted pretty close to 72
defects found and fixed before coding. We made mistakes, we just found and
fixed the majority of them before code was ever written.

*) 777 ATE: The business need was 30 months, the project was staffed to
get it done in that time. The original team wasted the first half of that
time writing research papers, surfing the web, playing games, etc.--not
doing any ATE requirements, design, or code work. When management found
the team had done nothing in 1.25 years, that team got shuffled out. A new
team was brought in. Using model-based development we were able to deliver
to the factory floor 3 days ahead of the original schedule. Similar
delivered defect densities as 767 ATE. The 777 Factory Manager insisted on
24x7 pager coverage for the first 6 weeks of use. If 777 ATE so much as
hiccuped, he wanted someone there to fix it NOW. Not a single call ever
happened. Interviews with shop floor mechanics (users) showed that they
were astonished by how such complex functionality could work so
flawlessly. They even set up a betting pool: $20 buy in, the first to be
able to reputably crash 777 ATE would win a $600 pool. As long as I was
with 777 ATE, nobody ever won the pool because nobody could crash it. Even
with a $600 incentive.

*) ATE Switch Matrix Driver re-write: Part of general ATE software in
Everett was the driver for a "switch matrix". This device allows ATE
instrumentation on one axis of wires to be arbitrarily switched into and
out of airplane test points on the other axis of wires. There are rules
about what switching was legal, like "No two output instruments can be
switched onto the same airplane point at the same time". The existing code
was about 4000 lines of spaghetti crap that was constantly failing. We
re-developed it in roughly a month and ended up with about 800 lines of
clean code that never broke from then on. When I say "never", I mean as
long as I was on the 777 ATE project which was about another 8 months. I
can't say it never failed after that because I lost contact with them for
about 15 years. But, if the switch matrix code was going to fail then it
should have failed at least once in that time.

*) 787 ATE: Can you say, deja vu? Again, the original team wasted the
first half of the schedule. Again, I got called in to bail out the project
with a replacement team. We delivered earlier than was required by the
original airplane development schedule. Remember that the whole airplane
program slipped by about 2 years. We would have been ready even if there
were no slips at all anywhere else in the airplane program. Similar
quality performance as 777 ATE and 767 ATE.

*) Oso and Altair: A pair of projects at Los Alamos National Lab that
prepare input data (2-D and 3-D models) for computational fluid dynamics
code. The need date for both projects was about 12 months, both were
delivered in about 6. Similar quality performance as ATE.

*) 777 ATE ACS Re-write: FAA rules are that one can't test a commercial
airplane with obsolete instrumentation. One part of 777 ATE was "ACS", a
driver to hardware that allows ATE to talk on the ARINC 629 bus. CDS, the
maker of the hardware, notified Boeing that the version they were using
would go obsolete in 12 months. ATE management estimated it would take at
least 12 months with 4 people to rewrite the driver code. I was called in
to help the team. We started with the original ACS requirements models and
modified them to account for hardware changes in the new device. Those
same model mods were forwarded into the design models and then into the
code. They were back on the air with the new ARINC 629 hardware in 3
months.

*) P-8 Mission Systems: The P-8 is the replacement for the Lockheed P-3
Submarine Chaser (https://en.wikipedia.org/wiki/Boeing_P-8_Poseidon). All
of the fly-the-airplane avionics was essentially stock 737 equipment--out
of scope for us. Our project was the mission systems in the back of the
plane: mission planning, mission execution, secure plane-to-plane
communication, target acquisition and tracking, targeting, . . . There
were about 250 developers on the project, working for about 7 years.
Unfortunately, the project went black (need-to-know security clearance, I
mean) before they finished and they're understandably tight-lipped about
it now. My best guess is that mission systems code is in the 5-7 million
SLOC range. I can't say that the software was done in half the time,
because they won't tell me. On the other hand, it's normal for projects of
this size to be substantially late, on the order of 100%. All I can say is
that there have been no reports of schedule delay or software quality
problems on the P-8. It's be so out of the news that most people don't
even know it exists. OTOH, if it were anything like a typical military
project of that size, it would have almost certainly been in the news for
some software-induced delay or another.

*) Well Placement Engineering: This was for an oilfield services company.
Most people think that oil wells are drilled straight vertical. Not so. To
take advantage of softer layers, wells can go many times the distance
horizontally as vertically. The drill bit is literally steered by an
operator to follow a pre-determined path. This project was for part of the
software that gives the drill operator control over the drill. Again,
model based requirements and design led to the project being delivered
early (sorry, I don't have exact how-early figures). I also don't have
delivered defect data from the field. However, the testers told me
personally that they were amazed by the quality of that software, they
literally could not find any defects in it at all. It passed almost every
test they threw at it.


There have been other projects, too. Unfortunately, I have less data about
those projects than these (above). And of course, anyone can throw out the
"But this is all anecdotal data" defense. And there's nothing I can do to
counter that. However, when you look at the typical results of software
projects in terms of over-cost, over-schedule, under-scoped,
defects-delivered, the pattern on these projects is decidedly different.
None of these were over schedule (the pattern, as I said, is to be early),
none were over cost, all delivered everything they were supposed to, and
customers were delighted that the code did what they wanted it to without
crashing or giving wrong answers.


Is this enough data? Or, do you need more?


-- steve




-----Original Message-----
From: systemsafety <systemsafety-bounces at lists.techfak.uni-bielefeld.de>
on behalf of Derek M Jones <derek at knosof.co.uk>
Organization: Knowledge Software, Ltd
Date: Friday, March 4, 2016 2:23 PM
To: "systemsafety at lists.techfak.uni-bielefeld.de"
<systemsafety at lists.techfak.uni-bielefeld.de>
Subject: Re: [SystemSafety] Modelling and coding guidelines: "Unambiguous
Graphical Representation"

Steve,

>> A very important question.  I'm not sure I have the answer, but I
>> data data showing it happening at multiple levels."
>
> That's interesting data, yes. But remember, that data is limited by how
> software development is being practiced today (by largely "highly paid

I want data about today's practices (the data is actually from 2005-2014,
the dates used by the papers that originally worked on it).
Why would you want data from further back (not that I think things
have changed much)?

> amateurs"), and not how software development SHOULD be practiced.

You seem to be willfully refusing to deal with a reality that does
not conform to your ideal view of how the world should be.

>> "The benefits of any upfront investment to make savings maintaining
>> what survives to be maintained has to be compared against the
>> costs for all the code that got written, not just what remains."
>
> Some of the software that gets built is intended to be single-use or is
>of
> intentionally short lifetime. My experience is that's a very small
>subset.

The data is from large, long lived (10-20 years) projects.

> I argue that what determines survivability of the vast majority of
> software is, essentially, quality. High quality (I.e., well-structured,

Quality as seen by the paying customer, which can be very different
from code quality.

> clean, etc.) code that reliably automates a solution is far, far more
> likely to survive than code that's crap (e.g., high technical debt) and
>is

Unsubstantiated, biased point of view.

Cost of maintenance is a drop in the pond compared to marketing expenses.

What is important is ability to add new features quickly so the next
version can be sold to generate revenue.
If a product is selling management will pay what it takes to get
something out the door.

> Using your terminology from
...
> I'm saying that I can make d1 and m1 such that:
>
> d1 = 0.5 * d
> m1 <= 0.75 * m
>
> Therefore, clearly, for any y >= 0
>
> d1 + y * m1 << d + y * m

Ok.  Can I have a copy of your data please.  I would be happy to
analyze and write about your success.


-- 
Derek M. Jones           Software analysis
tel: +44 (0)1252 520667  blog:shape-of-code.coding-guidelines.com
_______________________________________________
The System Safety Mailing List
systemsafety at TechFak.Uni-Bielefeld.DE



More information about the systemsafety mailing list